r/Glasgow Tools
Title
Author
capnbullseye
Comment
£100 million per ferry is just ridiculous. Quite why the dual-fuel LNG option was chosen is beyond me. If they wanted to go down the hybrid fuel route then there is much cheaper proven technology in hybrid battery tech
Reddit Link
https://www.reddit.com/r/glasgow/comments/eck4gk/costs_double_on_delayed_calmac_ferry_contract/fbc2rxk/
Created
Thu 19th Dec 2019 12:10am
Status
normal ()
Back to deleted posts list