r/Glasgow Tools

Title
Authorverygneiss
Comment
https://www.scottishconstructionnow.com/article/final-steel-section-delivered-at-sighthill-m8-bridge

It won't be lifted, the crane would need to be absolutely ginormous. It will be put onto some kind of SPMT or rail system, driven down onto the motorway, and then jacked up into position.
Reddit Linkhttps://www.reddit.com/r/glasgow/comments/msd73x/bridge/guyf1ps/
CreatedSun 18th Apr 2021 11:26am
Statusnormal ()

Back to deleted posts list