r/Glasgow Tools

Title
AuthorCanazza
Comment
The old Bridge St Station still runs alongside those tracks. Do that up as the Airport Link connection, have Bridge St Subway/Park & Ride be the connection, and/or put a travellator system from there to central proper.
Reddit Linkhttps://www.reddit.com/r/glasgow/comments/c03v4n/is_glasgow_central_at_capacity/er16ez8/
CreatedThu 13th Jun 2019 1:05pm
Status ()

Back to deleted posts list