There isn’t a human driver, so they don’t want a repeat of the DLR disaster. If anything showed up as a problem in testing it can take months to architect, build, certify, and test the solution.
They aren’t giving these things a shakedown in Govan, they are doing all the primary testing to make sure a totally bespoke subway solution is safe.