Comment | You're a bit off here.
The works on the M8 are because the concrete structure of several viaducts is literally crumbling. Hence the lane reductions at a few places to reduce the vehicle load.
What started as emergency works on one specific span at Woodside has spread as further problems have been discovered. [Seems a very reasonable time to ask if hundreds of millions of pounds should be funnelled into emergency repairs](https://www.glasgowtimes.co.uk/news/23375864.m8-repairs-should-paused-look-alternatives-motorway/), thereby ensuring the motorway remains unchanged for another 40-50 years. |
---|